Please use this identifier to cite or link to this item:
http://hdl.handle.net/10174/14541
|
Title: | Infraestruturas hidráulicas. Escavação de valas, equipamentos e análise económica |
Authors: | Portela, Cristina de Fátima Alves |
Advisors: | Vasconcelos, Maria Madalena V. Moreira |
Keywords: | Escavação de valas Classificação dos solos Entivação Segurança Equipamentos Custos Perfil-tipo Trenching Soil classification Shoring Safety Equipment Costs Standard profile |
Issue Date: | 2013 |
Publisher: | Universidade de Évora |
Abstract: | Nas obras de infraestruturas hidráulicas sistemas de abastecimento de água, sistemas de drenagem de águas residuais e pluviais e sistemas de rega - os processos de escavação das valas são fundamentais para a garantia do bom assentamento e desempenho das tubagens.
O dimensionamento do equipamento para a escavação de valas baseia-se no estudo geotécnico do terreno apresentado em projeto de modo a garantir a boa execução da obra.
Neste trabalho é apresentada e comparada a análise económica de duas formas de execução das valas: escavação de valas executadas pelo perfil-tipo do projeto, recorrendo ao uso de entivações, e escavação de valas com taludes inclinados e livres e abdicando do uso dos painéis de entivação, mantendo as condições de segurança da obra.
As conclusões deste trabalho salvaguardam a importância do cumprimento dos prazos da obra, a produção, os custos e a segurança; Abstract:
HYDRAULIC INFRASTRUCTURES
TRENCHES EXCAVATION, EQUIPMENTS AND ECONOMICAL ANALYSIS
In hydraulic infrastructures jobs such as water consumption and irrigation supply and wastewater and rainwater drainage, the processes used in the excavation and backfilling of trenches are key to ensure good performance and settlement of the pipes.
The size and type of equipment for excavation and backfilling trenches is done by careful analyzing the project geological data. Thus, only after knowing the terrain features we can choose the work equipment and the appropriate processes to the proper performance of this activity.
In this study is done the economical analysis based on two trench excavation methods. Firstly, we present the study of the costs of trench excavation performed by standard project profile, resorting to the use of shoring panels. Then the economical analysis of trenching creating security slopes on the walls of the trenches abdicating the use of shoring panels but keeping all the conditions of security for all workers.
Finally draw some conclusions about the study, safeguarding the importance of meeting deadlines without disregarding the production and safety of its players. |
URI: | http://hdl.handle.net/10174/14541 |
Type: | masterThesis |
Appears in Collections: | BIB - Formação Avançada - Teses de Mestrado
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|